From 11th July - Temporary Road Closure - Trotts Lane
•
From 5th July - Temporary Road Closure - Long Lane
•
From 24th June 2010 - Temporary Road Closure that length of A326 Marchwood Bypass Totton between its junction with A35 at Rushington roundabout and its junction with A326 Totton Western Bypass; for a period of six months or until completion of the works whichever is sooner. (Notwithstanding the above it is expected that the closure will be required for no longer than two weeks, between 1830hrs and 0630hrs only each night)
•
From April 7th 2010 - temporary road closure - Trotts Lane